Why ENKI

An Engineering Company Committed to Structural Service Life

We provide fire protection and corrosion protection at operating industrial plants, mining and processing facilities, combined heat and power plants, oil and gas facilities, and transport infrastructure.

Our Approach

Engineering First, Materials Second

Structural protection begins not with purchasing coating materials but with reliable baseline data: structural types, required fire-resistance ratings, actual exposure conditions, and site accessibility.

Engineering calculations determine the coating system, required dry film thickness, and material consumption. This helps avoid both inadequate protection and unnecessary expenditure.

Our own certified crews perform the work, with every stage recorded in as-built documentation for acceptance by technical supervisors and regulatory authorities.

On-site coating thickness inspection

Benefits

Eight reasons to work with ENKI

01

Engineering expertise

Fire-resistance calculations and coating system selection are handled by specialist engineers, not procurement staff.

02

End-to-end services

Fire protection, corrosion protection, industrial cleaning, and development of special technical specifications and fire-protection designs.

03

Our in-house team

Work is carried out by qualified specialists with dedicated training.

04

Quality Control

Stage-by-stage quality control of surface preparation, coating thickness, and adhesion.

05

Major industrial facilities

Experience at operating industrial plants, mining and processing facilities, CHP plants, refineries, and infrastructure sites.

06

Documentation support

As-built documentation, material certificates, and support during inspections.

07

Certified materials

Only materials with valid certificates and test reports.

08

Accountability for Results

Compliance with technical specifications and deadlines is contractually guaranteed, not merely promised.

Geographic Coverage

Projects Across Russia

  • Moscow and Moscow Region Head office in Khimki; projects at Sheremetyevo and industrial sites
  • Murmansk Region Zapolyarny, Monchegorsk, Kovdor — mining and metallurgical facilities, processing plants, and fuel terminals
  • Krasnoyarsk Krai Norilsk, Talnakh, Krasnoyarsk — metallurgy and gold mining
  • Vologda Region Cherepovets, Sokol — metallurgy and timber processing
  • Irkutsk Region Bodaybo, Verninskoye — mineral processing plants
  • Leningrad Region Kolpino, Izhora industrial site — pipe manufacturing
  • Republic of Karelia Segezha — pulp and paper mill
  • Novgorod Region Veliky Novgorod — chemical manufacturing facilities
  • Arkhangelsk Region Power generation and pulp and paper facilities
  • Yaroslavl and Kostroma Regions Combined heat and power plants and boiler houses
  • Sverdlovsk Region Talitsky Mining and Processing Plant, industrial sites in the Urals
  • Krasnoyarsk – Taimyr Dudinka and Dikson – northern fuel infrastructure

Clients

Companies We Have Worked With

NN Norilsk NickelMetallurgy
KGMK Kola Mining and Metallurgical CompanyMetallurgy
KGOK Kovdorsky Mining and Processing PlantMining
AP ApatitChemicals
SS SeverstalMetallurgy
GPN Gazpromneft Moscow RefineryOil Refining
PK Polyus KrasnoyarskGold Mining
PV Polyus VerninskoyeGold Mining
PS Polyus StroyConstruction
SVO Sheremetyevo AirportInfrastructure
AK AcronChemicals
KM CryogenmashMechanical Engineering
STsBK Segezha Pulp and Paper MillPulp and paper
SDOK Sokol Wood Processing PlantWood Processing
ITZ Izhora Pipe MillMetallurgy
RC Renaissance ConstructionGeneral contracting
TTK Taimyr Fuel CompanyFuel
SZFK SZFK Oleniy RucheyMining
VKK VKK Talitsky Mining and Processing PlantMining
NNR NorilsknickelremontIndustrial services
MR Medvezhy RucheyMining
TGC TGC-2Power Generation
KG Cryogenmash-GasIndustrial gases
SLT Sokol CLTWood Processing

Ready to Protect Your Facility?

Tell us about your project. ENKI specialists will recommend the most suitable solution and provide a preliminary cost estimate.