Coating adhesion depends on the quality of cleaning. We review surface preparation grades, methods and common on-site mistakes.
Up to 80% of premature coating delamination is associated with surface preparation rather than the coating material. Even a certified product applied at the specified thickness can fail after the first thermal cycle if mill scale, salts or oil residue remain beneath it.
The most common on-site mistake is a delay between cleaning and priming. Prepared steel can begin to oxidize within hours, so work is organized in sections: each area is cleaned and primed during the same shift.
Tell us about your project. ENKI specialists will recommend the most suitable solution and provide a preliminary cost estimate.